Checklist for Pump Trucks
|
Inspection Items |
Legislation |
Y* |
N* |
Corrective Action /
Comments |
|
Date |
Act |
Reg.* |
|
|
|
Safety Equipment |
|
|
|
|
|
First aid kits
|
|
G* 12 (1) |
|
|
|
|
Person to administer first aid |
|
G 12 (6) |
|
|
|
|
Protective headgear |
|
G 40 (1) |
|
|
|
|
Protective footwear |
|
G 41 (1) |
|
|
|
Inspection & Maintenance |
|
|
|
|
|
Operator Training
|
9(2)(c |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Logbook should include the
following info.
- Repairs - Modifications - Inspection schedules - Hours of service |
|
G 210 (3) |
|
|
|
Maintenance schedule in place
according to manufacturer
|
|
G 210 (1) |
|
|
|
Vehicle with hauling capacity 1 tonne or greater |
|
|
|
|
|
|
Operated by competent employee |
|
G 210.1 (1) |
|
|
|
|
Back up alarm |
|
G 224 (f) |
|
|
|
|
Adequate brakes |
|
G 224 (c) |
|
|
|
|
Steps, handholds 3 point contact |
|
G 224 (k) |
|
|
|
|
Rear view mirror or signaler (when operator’s view is obstructed when backing up) |
|
G 230.31 (1) |
|
|
|
Moving
parts adequately guarded (universal joint in front of vehicle)
|
|
G* 242 (1) |
|
|
|
Positioning mixer next to
excavation (1 to 1 rule)
|
|
G 181 (3) |
|
|
|
Positioning mixer next to
power lines
|
|
G 289 (1) |
|
|
|
General Operation
|
|
|
|
|
|
Outriggers should be fully
extended during use
|
|
G 234 (2) |
|
|
|
Pump truck should not be
moved when mast is extended
|
|
G 215 |
|
|
|
Hoppers equipped with auger
should be equipped with a grille
|
|
G 242 (1) |
|
|
|
Distribution mast should not
be used to lift load
|
|
|
|
|
|
No person should stand under
the mast other than worker placing concrete
|
|
|
|
|
|
Clean Out Procedures
|
|
|
|
|
|
Follow manufacturer’s
recommended procedures
|
|
|
|
|
|
Depressurize the system
before releasing pipe coupling
|
|
|
|
|
|
Keep workers away from
discharge end when system is under pressure
|
|
|
|
|
|
Make sure discharge end is
secured and has a trap basket
|
|
|
|
|
|
Other
|
|
|
|
|
|
Safety devices
a) distribution mast b) outriggers c) hose connectors |
|
|
|
|
|